We were appointed to deliver and install multiple large pieces of laboratory equipment into a facility where internal access routes were not suitable. The only viable solution was to bring the equipment in through a first-floor laboratory window.

he Challenge

This project presented several complex challenges:

  • No suitable internal access: Doorways and corridors were too restricted for the size and weight of the equipment
  • Height access required: Equipment needed to be delivered to an upper-level laboratory
  • Heavy and sensitive loads: Required careful handling to prevent damage or misalignment
  • Urban London location: Limited external working space and strict safety considerations

Our Solution: Scaffold Tower & Forklift Lift-In

To overcome these challenges, we designed a safe external lifting operation using a scaffold tower and forklift system, allowing controlled access directly through the lab window.

Key Elements of the Solution

  • Scaffold Tower Installation
    • Built a fully compliant scaffold tower to the height of the lab window
    • Provided a stable working platform for guiding equipment safely into position
    • Included edge protection and safe access for operatives
  • Forklift Lifting Operation
    • Used a suitably rated forklift to lift equipment to the required height
    • Loads secured and balanced to maintain stability during lifting
    • Coordinated lift under strict supervision
  • Window Access Preparation
    • Window opening prepared and protected
    • Internal and external surfaces covered to prevent damage

Execution

  1. Pre-Planning & Site Setup
    • Detailed site survey and lift plan created
    • Risk assessments and method statements (RAMS) completed
    • Delivery coordinated to minimise disruption
  2. Scaffold Construction
    • Tower erected and inspected prior to use
    • Checked for stability, safe loading, and access
  3. Lifting Operation
    • Equipment lifted externally via forklift to scaffold platform level
    • Operatives positioned on scaffold to guide and stabilise loads
  4. Equipment Transfer
    • Units carefully moved through the window opening
    • No sudden movements, maintaining full control throughout
  5. Internal Positioning & Installation
    • Equipment unpacked within the lab
    • Positioned accurately using specialist handling equipment
    • Final placement completed to client specification

Outcome

  • All equipment safely delivered and installed with zero damage
  • Efficient solution implemented despite restricted building access
  • Full compliance with safety and lifting regulations
  • Project completed on schedule

Key Success Factors

  • Innovative external access solution using scaffold and lifting equipment
  • Detailed lift planning and coordination
  • Experienced team managing both height work and equipment handling
  • Strong focus on safety and precision throughout

Conclusion